Menu Call

HMT teamed up with HNTB and is responsible for all surveying for this project. Extensive topography/design survey and boundary verification has been done on 32 railroad crossing locations across the city of New Braunfels. Deliverables include a boundary control network for each site and detailed topography/design survey exhibits for all 32 locations. This has been a two-year project and we are plan to complete the third and final phase in the next two months.