Menu Call

HMT was contracted in 2012 to survey 2400+ acres of property owned by Cemex Industries. HMT performed the field work and performed research to verify adjoiners. In 2012, HMT was also asked to prepare a drainage report for the Offsite Watershed area of the Cemex property. In 2013, HMT was contracted to calculate and design culverts to be installed under a proposed berm. HMT oversaw the boundary, spot evaluations/topography survey of the 2400 acres.